664 B
664 B
Repair Procedures
Common Repairs
Fan Replacements
- Steps:
- Power down the miner and unplug it.
- Remove the faulty fan.
- Install the new fan.
- Power up the miner and verify operation.
Chip Swaps
- Steps:
- Power down the miner and unplug it.
- Remove the damaged chip.
- Install the new chip.
- Power up the miner and verify operation.
Merges
- Steps:
- Power down the miner and unplug it.
- Connect the miners as per the merge instructions.
- Power up the miners and verify operation.
Repair Facility
- All major repairs should be conducted at the primary facility designated for repairs.