763 B
763 B
Hardware Setup
Required Equipment
- Antminer S19 (k pro, j pro xp, j models)
- Power Supply Units (PSUs)
- Ethernet Cables
- Cooling Systems (fans, AC units)
Setup Steps
- Unpack the Hardware: Carefully remove the Antminer S19 units and PSUs from their packaging.
- Connect Power Supplies: Attach the PSU to each miner using the provided cables.
- Network Configuration: Connect the miners to your network using Ethernet cables.
- Cooling Setup: Ensure that all cooling systems are properly installed and functional.
Troubleshooting
- No Power: Check the PSU connections and ensure that they are securely attached.
- Network Issues: Verify that the Ethernet cables are properly connected and check your network settings.